Sales
Rental
Repair
731
Boise, ID 208-377-0158
Eugene, OR 541-342-3641
Idaho Falls, ID 208-522-7082
Medford, OR 541-779-0187
Division 25 – Integrated Automation
Division 26 – Electrical
Division 27 – Communications
Division 28 – Electronic Safety & Security
Division 29 - RESERVED FOR FUTURE EXPANSIO
Site & Infrastructure Subgroup:
Division 30 – RESERVED FOR FUTURE EXPANSION
Division 31 – Earthwork
Division 32 – Exterior Improvements
Division 33 – Utilities
Division 34 – Transportation
Division 35 – Waterway & Marine
Division 36 to 39 – RESERVED FOR FUTURE EXPANSION
Process Equipment Subgroup:
Division 40 – Process Integration
Division 41 – Material Processing & Handling Equipment
Division 42 – Process Heating, Cooling, & Drying Equipment
Division 43 – Process Gas & Liquid Handling, Purification &
Storage Equipment
Division 44 – Pollution Control Equipment
Division 45 – Industry-Specific Manufacturing Equipment
Division 46 – Water & Wastewater Equipment
Division 47 – RESERVED FOR FUTURE EXPANSION
Division 48 – Electrical Power Generation
Division 49 – RESERVED FOR FUTURE EXPANSION
Division 1 – General Requirements
Division 2 – Sitework
Division 3 – Concrete
Division 4 – Masonry
Division 5 – Metals
Division 6 – Wood & Plastics
Division 7 – Thermal & Moisture Protection
Division 8 – Doors & Windows
Construction CSI Specification Divisions Overview.
Ask your Edge sales representative what products and information we can supply to meet your
specification and submittal needs.
CSI standard formatting is used throughout the construction industry to format construction specifications in building
contracts. The purpose of this industry standard format is to assist the user in locating specific types of information. The
information contained in CSI’s Master Format is organized in a standardized outline form within 16 (pre-2004) or 50 (post
2004) divisions. Each division contains a number of sections. Each section is divided into three parts—"general,"
"products," and "execution." Each part is organized by a standardized system of articles and paragraphs.
General Requirements Subgroup
Division 01 – General Requirements
Facility Construction Subgroup
Division 02 – Existing Conditions
Division 03 – Concrete
Division 04 – Masonry
Division 05 – Metals
Division 06 - Wood, Plastics & Composites
Division 07 – Thermal & Moisture Protection
Division 08 – Openings
Division 09 – Finishes
Division 10 – Specialties
Division 11 – Equipment
Division 12 – Furnishings
Division 13 – Special Construction
Division 14 – Conveying Equipment
Division 15 to 19 – RESERVED FOR FUTURE EXPANSION
Facility Services Subgroup:
Division 20 – RESERVED FOR FUTURE EXPANSION
Division 21 – Fire Suppression
Division 22 – Plumbing
Division 23 – Heating Ventilating & Air Conditioning
Division 24 - RESERVED FOR FUTURE EXPANSION
Post 2004 Master Format with 50 Divisions:
PROCUREMENT & CONTRACTING REQUIREMENTS GROUP:
Division 00 – Procurement & Contracting Requirements
SPECIFICATIONS GROUP:
Division 9 – Finishes
Division 10 – Specialties
Division 11 – Equipment
Division 12 – Furnishings
Division 13 – Special Construction
Division 14 – Conveying Systems
Division 15 – Mechanical
Pre 2004 Format with 16 Divisions:
Construction CSI Specifications
Divisions Overview